Home Lawns and Landscaping

Please contact your local Legend supplier about their installation service or you may choose to do-it-yourself:

 

Site Preparation
  • Rotary hoe or spread top soil to a depth of 100-150mm
  • Remove stones and lumps of organic matter
  • Level to pathways and rake an even surface
  • Spread lawn starter fertiliser at 5kg per 100 square metres
    (add lime if your soil is acidic)
  • Lightly roll or water the area into a firm surface
Installation
  • Lightly water prepared area
  • Roll out your Legend in a brick work pattern
  • Push individual strips together firmly – do not stretch
  • Cut turf with a sharp knife around plants and paths
  • Water immediately to saturate the grass mat and wet underneath soil
Establishment
  • Watering: Water your Legend during installation and then up to 4 times a day for the first 2 weeks. Gradually reduce frequency as the roots establish
  • Mowing – First mowing at 2-3 weeks after laying with mower on the highest setting
  • Fertilising – Fertilise 4 weeks after laying with a complete lawn food (22:5:8 or similar) at 3-4 kg per 100 square metres